共 17 条
[1]
Foyer P., Why Production Engineers are Vital to FMS. Production Engineer, (1983)
[2]
Hammer H., Gallien D., Efficient and Cost Effective Use of Modular Fixture Kits at Machine Site, Tz Fur Metallbearbeitung, (1983)
[3]
Khaw J., Lim B.S., Lim L., Shop floor scheduling using a three dimensional neural network model, Proceedings of the 1St International Conference on CIM, pp. 563-566, (1991)
[4]
Koh S.L., Intelligent Modular Fixture Design System. Nanyang Technological Institute, School of Mechanical and Production Engineering, (1990)
[5]
Lam S.L., Lim B.S., An integrated robotics off-line programming system for modular fixture assembly, Journal of Mechanical Working Technology, 20, pp. 261-272, (1989)
[6]
Lee B.H., Lim B.S., Nee A., IKOOPPS: An intelligent knowledge-based object oriented process planning system for the manufacture of progressive dies, International Journal of Knowledge Engineering, 8, pp. 19-33, (1991)
[7]
Lewis G., Modular fixturing systems, Proceedings of the 2Nd International, Conference on FMS, (1983)
[8]
Lim B.S., An IKBS for integrating component design to tool engineering, International Journal of Knowledge Engineering, 4, 4, pp. 252-291, (1987)
[9]
Lim B.S., Integration of component design with tool engineering using artifical intelligence and CAD techniques, Journal of Mechanical Working Technology, 17, pp. 61-72, (1988)
[10]
Lim B.S., Knight J., HOLDEX-holding device expert system. Proceedings of the, 1St International Conference on Applications of AI in Engineering Problems, pp. 483-502, (1986)