SIMULATED VERSUS REAL LIFE DATA IN TESTING THE EFFICIENCY OF SCHEDULING ALGORITHMS

被引:19
作者
AMAR, AD [1 ]
GUPTA, JND [1 ]
机构
[1] BALL STATE UNIV,COLL BUSINESS,MUNCIE,IN 47306
关键词
D O I
10.1080/07408178608975325
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:16 / 25
页数:10
相关论文
共 7 条
[1]  
Barnes J. W., 1977, AIIE T, V9, P23
[2]  
BARNES JW, 1976, UT763 U TEX AUST REP
[3]  
BHADURI B, 1970, THESIS N CAROLINA ST
[4]  
Elmaghraby S, 1974, AIIE T, V6, P1, DOI DOI 10.1080/05695557408974926
[5]  
Garey MR., 1979, COMPUTERS INTRACTABI
[6]   SCHEDULING WITH DEADLINES AND LOSS FUNCTIONS [J].
MCNAUGHTON, R .
MANAGEMENT SCIENCE, 1959, 6 (01) :1-12
[7]   AN EMPIRICAL-EVALUATION OF THE ENTRAPMENT PROCEDURE FOR SCHEDULING JOBS ON IDENTICAL MACHINES [J].
VASILESCU, EN ;
AMAR, AD .
IIE TRANSACTIONS, 1983, 15 (03) :261-263