共 11 条
[1]
INCLUSION OF INTER-AREA TRANSMISSION IN PRODUCTION COSTING SIMULATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1978, 97 (05)
:1481-1488
[2]
MULTI-AREA DISPATCH
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1971, PA90 (06)
:2661-&
[3]
A DUAL INTERVAL PROGRAMMING APPROACH TO POWER SYSTEM RELIABILITY EVALUATION
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1981, 100 (04)
:1665-1673
[4]
AN ANALYSIS OF ELECTRIC-POWER BROKERAGE SYSTEMS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1982, 101 (02)
:389-396
[5]
El-Hawary M.E., 1979, OPTIMAL EC OPERATION
[6]
GARVER LL, 1984, 46TH AM POW C M CHIC
[7]
ESTIMATION OF POWER-POOLING BENEFITS FROM PRODUCTION SIMULATIONS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1981, 100 (04)
:1759-1765
[8]
MIRSKY MS, 1985, IEEE T POWER APPARAT, V104, P2994
[9]
A METHOD TO EVALUATE ECONOMIC-BENEFITS IN INTERCONNECTED SYSTEMS
[J].
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS,
1983, 102 (02)
:472-480
[10]
WOOF RF, 1983, ELECTRICAL WORLD DEC, P59