ON JOHNSONS 2-MACHINE FLOWSHOP WITH RANDOM PROCESSING TIMES

被引:55
作者
KU, PS
NIU, SC
机构
[1] Univ of Texas at Dallas, Richardson,, TX, USA, Univ of Texas at Dallas, Richardson, TX, USA
关键词
D O I
10.1287/opre.34.1.130
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:130 / 136
页数:7
相关论文
共 17 条
[1]  
Bagga P.C., 1970, OPSEARCH, V7, P184
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]   SCHEDULING JOBS, WITH EXPONENTIALLY DISTRIBUTED PROCESSING TIMES, ON 2 MACHINES OF A FLOW SHOP [J].
CUNNINGHAM, AA ;
DUTTA, SK .
NAVAL RESEARCH LOGISTICS, 1973, 20 (01) :69-81
[4]  
FROSTIG E, 1985, UNPUB NAVAL RES LOGI
[5]  
Jackson J.R., 1956, NAV RES LOGIST Q, V3, P201, DOI [10.1002/nav.3800030307, DOI 10.1002/NAV.3800030307]
[6]  
Johnson S. M., 1954, NAV RES LOGIST Q, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[7]   CLASSES OF ORDERINGS OF MEASURES AND RELATED CORRELATION INEQUALITIES .1. MULTIVARIATE TOTALLY POSITIVE DISTRIBUTIONS [J].
KARLIN, S ;
RINOTT, Y .
JOURNAL OF MULTIVARIATE ANALYSIS, 1980, 10 (04) :467-498
[8]  
Karlin S., 1968, TOTAL POSITIVITY, VI
[9]  
Keilson J, 1982, CAN J STAT, V10, P181, DOI DOI 10.2307/3556181
[10]   A NOTE ON THE 2 MACHINE JOB SHOP WITH EXPONENTIAL PROCESSING TIMES [J].
PINEDO, M .
NAVAL RESEARCH LOGISTICS, 1981, 28 (04) :693-696