A BRANCH AND BOUND ALGORITHM FOR ASSEMBLY LINE BALANCING PROBLEMS WITH FORMULATION IRREGULARITIES

被引:54
作者
JOHNSON, RV [1 ]
机构
[1] UNIV OTAGO,FAC COMMERCE,DUNEDIN,NEW ZEALAND
关键词
D O I
10.1287/mnsc.29.11.1309
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:1309 / 1324
页数:16
相关论文
共 39 条
[1]  
Arcus AL, 1965, INT J PROD RES, P259
[2]   ASSEMBLY-LINE BALANCING BY LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1960, 8 (03) :385-389
[3]  
Buffa E.S., 1961, MODERN PRODUCTION MA
[4]  
Carnall C.A., 1976, INT J PROD RES, V14, P703, DOI [10.1080/00207547608956389, DOI 10.1080/00207547608956389]
[5]  
CHARLTON JM, 1969, INT J PROD RES, V7, P207
[6]  
Dar-El E.M., 1975, INT J PROD RES, V13, P463, DOI DOI 10.1080/00207547508943016
[7]  
Davis L.E., 1965, INT J PROD RES, V4, P171, DOI [10.1080/00207546508919974, DOI 10.1080/00207546508919974]
[8]   AN ALGORITHM FOR THE LINE BALANCING PROBLEM [J].
GUTJAHR, AL ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1964, 11 (02) :308-315
[9]   MECHANIZED ASSEMBLY SYSTEM ITS INFLUENCE ON COMPONENT DESIGN AND TOLERANCES [J].
HEGINBOTHAM, WB ;
TEWARI, NK .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1978, 16 (01) :63-75
[10]   ASSEMBLY-LINE BALANCING - DYNAMIC-PROGRAMMING WITH PRECEDENCE CONSTRAINTS [J].
HELD, M ;
KARP, RM ;
SHARESHIAN, R .
OPERATIONS RESEARCH, 1963, 11 (03) :442-459