共 10 条
- [1] Akella R., Choong Y.F., Gershwin S.B., Performance of hierarchical production scheduling policy, IEEE Trans. Components Hybrids Mfg. Technol. CHMT, 7, pp. 225-240, (1984)
- [2] Akella R., Kumar P.R., Optimal control of production rate in a failure-prone manufacturing system, IEEE Transactions on Automatic Control, 31, pp. 116-126, (1986)
- [3] Akella R., Maimon O., Gershwin S.B., Value function approximation via linear programming for FMS scheduling, Int. J. Prod. Res., 28, 9, pp. 1459-1470, (1990)
- [4] Dielecki T., Kumar P.R., Optimality of zero-inventory policies for unreliable manufacturing systems, Operations Research, 36, pp. 532-541, (1988)
- [5] Bryson A.E., Ho Y.-C., Applied Optimal Control, (1969)
- [6] Burden R.L., Faires J.D., Numerical Analysis, (1989)
- [7] Gershwin S.B., Akella R., Choong Y.F., Short term scheduling of an automated manufacturing facility, IBM J. of Res. and Development, 29, pp. 392-400, (1985)
- [8] Ilyutovich A., Khmenlnitsky E., A Numerical Method for an Optimal Control Problem with Constraints on State Variables, Based on the Maximum Principle, (1991)
- [9] Maimon O., Gershwin S.B., Dynamic scheduling and routing for flexible manufacturing systems that have unreliable machines, Operations Research, 36, pp. 279-292, (1988)
- [10] Sharifnia A., Optimal production control of a manufacturing system with machine failures, IEEE Trans. on Automatic Control, 33, 7, pp. 620-625, (1988)