A DYNAMIC SCHEDULING AND CONTROL-SYSTEM IN AN ENSIDESA STEEL PLANT

被引:6
作者
DIAZ, A
SANCHO, L
GARCIA, R
LARRANETA, J
机构
[1] EMPRESA NACL SIDERURGICA,DEPT TECH,LD-III STEEL PLANT,AVILES ASTURIAS,SPAIN
[2] UNIV SEVILLE,DEPT IND ENGN,SEVILLE,SPAIN
关键词
INDUSTRIES; MINING METALS COMPUTERS; SYSTEM DESIGN AND OPERATION;
D O I
10.1287/inte.21.5.53
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
When we at Empresa Nacional Siderurgica (ENSIDESA) built our new steel plant in 1988, we emphasized automatic control in the various production sections, giving the process computers continuous and complete information throughout the production process. Making use of this information, we designed an automatic coordinating system for each facility in the plant. We designed this system by dynamically updating previous schedules, taking into account every possible event or delay to create a complete and systematic schedule each heat should follow to avoid scheduling breakdowns.
引用
收藏
页码:53 / 62
页数:10
相关论文
共 7 条
[1]   A SCHEDULING MODEL FOR LTV STEELS CLEVELAND WORKS TWIN STRAND CONTINUOUS SLAB CASTER [J].
BOX, RE ;
HERBE, DG .
INTERFACES, 1988, 18 (01) :42-56
[2]  
BRUNER RW, 1990, STEEL TIMES, V218, P15
[3]  
Fox B. R., 1985, Second Conference on Artificial Intelligence Applications: The Engineering of Knowledge-Based Systems (Cat. No.85CH2215-2), P487
[4]   DISCRETE-EVENT SIMULATION [J].
GARZIA, RF ;
GARZIA, MR ;
ZEIGLER, BP .
IEEE SPECTRUM, 1986, 23 (12) :32-36
[5]  
GUGLIERMINA P, 1987, IRONMAK STEELMAK, V14, P79
[6]  
HARMS U, 1987, STAHL EISEN, V107, P1167
[7]  
Rinnooy Kan AHG, 1976, MACHINE SCHEDULING P