ASSEMBLY-LINE BALANCING - ZERO-ONE PROGRAMMING WITH FIBONACCI SEARCH

被引:102
作者
PATTERSON, JH
ALBRACHT, JJ
机构
[1] PENN STATE UNIV,UNIVERSITY PK,PA 16802
[2] RCA SOLID STATE,SOMMERVILLE,NJ
关键词
D O I
10.1287/opre.23.1.166
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:166 / 172
页数:7
相关论文
共 14 条
[1]   ASSEMBLY-LINE BALANCING BY LINEAR-PROGRAMMING [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1960, 8 (03) :385-389
[2]   INTEGER PROGRAMMING BY IMPLICIT ENUMERATION AND BALAS METHOD [J].
GEOFFRION, AM .
SIAM REVIEW, 1967, 9 (02) :178-+
[3]   AN ALGORITHM FOR THE LINE BALANCING PROBLEM [J].
GUTJAHR, AL ;
NEMHAUSER, GL .
MANAGEMENT SCIENCE, 1964, 11 (02) :308-315
[4]  
HELD M, 1963, OPER RES, V10, P442
[5]  
HESKIAOFF H, 1968, WESTERN ELECTR ENG, V12, P9
[6]  
IGNALL EJ, 1965, J IND ENGINEERING, V16, P244
[7]   A COMPUTING PROCEDURE FOR A LINE BALANCING PROBLEM [J].
JACKSON, JR .
MANAGEMENT SCIENCE, 1956, 2 (03) :261-271
[8]  
Kilbridge M., 1961, J IND ENG, V12, P292
[9]   EXPERIMENTAL INVESTIGATION AND COMPARATIVE EVALUATION OF PRODUCTION LINE BALANCING TECHNIQUES [J].
MASTOR, AA .
MANAGEMENT SCIENCE SERIES A-THEORY, 1970, 16 (11) :728-746
[10]  
MOODIE CL, 1966, J IND ENGINEERING, V17, P377