STOCHASTIC SEASONAL PLANNING IN MULTIRESERVOIR HYDROELECTRIC POWER-SYSTEMS BY DIFFERENTIAL DYNAMIC-PROGRAMMING

被引:9
作者
GJELSVIK, A
机构
关键词
D O I
10.4173/mic.1982.3.1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
引用
收藏
页码:131 / 149
页数:19
相关论文
共 17 条
[1]  
Bryson A.E, 1975, APPL OPTIMAL CONTROL
[2]   CONTRIBUTION OF STOCHASTIC CONTROL SINGULAR PERTURBATION AVERAGING AND TEAM THEORIES TO AN EXAMPLE OF LARGE-SCALE SYSTEMS - MANAGEMENT OF HYDROPOWER PRODUCTION [J].
DELEBECQUE, F ;
QUADRAT, JP .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1978, 23 (02) :209-222
[3]  
DILLON TS, 1980, ELECTRICAL POWER ENE, V2, P2
[4]  
EGELAND O, 1982, CIGRE3214 PAP
[5]  
El-Hawary M.E., 1979, OPTIMAL EC OPERATION
[6]  
FALGARONE F, 1978, 6TH POW SYST COMP C, P568
[7]  
GJELSVIK A, 1980, THESIS U TRONDHEIM T
[8]  
GJELSVIK A, 1980, EFI2590 NORW RES I E
[9]   DISCRETE DIFFERENTIAL DYNAMIC PROGRAMING APPROACH TO WATER RESOURCES SYSTEMS OPTIMIZATION [J].
HEIDARI, M ;
CHOW, VT ;
KOKOTOVIC, PV ;
MEREDITH, DD .
WATER RESOURCES RESEARCH, 1971, 7 (02) :273-+
[10]  
Jacobson D. H., 1970, DIFFERENTIAL DYNAMIC