PROTECTIVE STOCKS IN MULTI-STAGE PRODUCTION SYSTEMS

被引:36
作者
LAMBRECHT, MR
MUCKSTADT, JA
LUYTEN, R
机构
关键词
D O I
10.1080/00207548408942517
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:1001 / 1025
页数:25
相关论文
共 22 条
  • [1] BANERJEE A, 1978, BUFFER INVENTORIES M
  • [2] IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS
    BLACKBURN, JD
    MILLEN, RA
    [J]. MANAGEMENT SCIENCE, 1982, 28 (01) : 44 - 56
  • [3] BUECHEL A, 1982, ENG COSTS PRODUC APR, P43
  • [4] CARLSON R, 1981, 812 STANF U DEP IND, P29
  • [5] CARLSON R, 1981, 813 STANF U DEP IND, P27
  • [6] CLARK A, 1960, MANAGE SCI, V6, P474
  • [7] CLARK AJ, 1962, STUDIES APPLIED PROB, pCH5
  • [8] COLLIER D, 1982, MANAGEMENT SCI NOV, P1296
  • [9] ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS
    CROWSTON, WB
    WAGNER, M
    WILLIAMS, JF
    [J]. MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05): : 517 - 527
  • [10] DEBODT M, 1982, ENG COSTS PRODUC APR, P67