A BRANCH-AND-BOUND PROCEDURE TO SOLVE A BICRITERION SCHEDULING PROBLEM

被引:51
作者
SEN, T
GUPTA, SK
机构
关键词
D O I
10.1080/05695558308974617
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:84 / 88
页数:5
相关论文
共 14 条
[1]   SEQUENCING INDEPENDENT JOBS WITH A SINGLE RESOURCE [J].
BAKER, KR ;
NUTTLE, HLW .
NAVAL RESEARCH LOGISTICS, 1980, 27 (03) :499-510
[2]   SCHEDULING OF A SINGLE-MACHINE TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME SUBJECT TO RELEASE DATES [J].
BIANCO, L ;
RICCIARDELLI, S .
NAVAL RESEARCH LOGISTICS, 1982, 29 (01) :151-167
[3]   SCHEDULING TO MINIMIZE WEIGHTED SUM OF COMPLETION TIMES WITH SECONDARY CRITERIA [J].
BURNS, RN .
NAVAL RESEARCH LOGISTICS, 1976, 23 (01) :125-129
[4]  
Conway R, 1967, THEORY SCHEDULING
[5]   ONE MACHINE SEQUENCING TO MINIMIZE MEAN FLOW TIME WITH MINIMUM NUMBER TARDY [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :585-592
[6]   NOTE ON A SCHEDULING PROBLEM WITH DUAL CRITERIA [J].
EMMONS, H .
NAVAL RESEARCH LOGISTICS, 1975, 22 (03) :615-616
[7]   DUAL ALGORITHM FOR ONE-MACHINE SCHEDULING PROBLEM [J].
FISHER, ML .
MATHEMATICAL PROGRAMMING, 1976, 11 (03) :229-251
[8]  
Gupta J.N.D., 1971, INT J PROD RES, V9, P267
[9]   EXTENSION OF A RESULT ON SCHEDULING WITH SECONDARY CRITERIA [J].
HECK, H ;
ROBERTS, S .
NAVAL RESEARCH LOGISTICS, 1972, 19 (02) :403-405
[10]  
PANWALKAR SS, 1973, S THEORY SCHEDULING