共 16 条
- [1] Brucker P., 1977, Mathematics of Operations Research, V2, P275, DOI 10.1287/moor.2.3.275
- [2] Coffman E.G., 1976, COMPUTER JOB SHOP SC
- [3] COFFMAN EG, 1972, ACTA INFORM, V1, P200, DOI DOI 10.1007/BF00288685
- [4] SCHEDULING PRECEDENCE GRAPHS OF BOUNDED HEIGHT [J]. JOURNAL OF ALGORITHMS, 1984, 5 (01) : 48 - 59
- [6] PROFILE SCHEDULING OF OPPOSING FORESTS AND LEVEL ORDERS [J]. SIAM JOURNAL ON ALGEBRAIC AND DISCRETE METHODS, 1985, 6 (04): : 665 - 687
- [7] SCHEDULING OPPOSING FORESTS [J]. SIAM JOURNAL ON ALGEBRAIC AND DISCRETE METHODS, 1983, 4 (01): : 72 - 93
- [8] LAWLER EL, 1982, DETERMINISTIC STOCHA, P101
- [9] LAWLER EL, 1989, BSR8909 CWI REP
- [10] LIU Z, 1991, INRIA1525 RAPP RECH