JOB SCHEDULING IN A GROUP TECHNOLOGY ENVIRONMENT FOR A SINGLE FACILITY

被引:19
作者
OZDEN, M
EGBELU, PJ
IYER, AV
机构
关键词
D O I
10.1016/0360-8352(85)90037-3
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:67 / 72
页数:6
相关论文
共 24 条
[1]  
Arn E. A., 1975, GROUP TECHNOLOGY
[2]  
Baker K., 1974, INTRO SEQUENCING SCH
[3]  
Bellman R., 1962, J ASS COMPUT MACH, V9
[4]  
Boothroyd G, 1989, FUNDAMENTALS METAL M
[5]  
Brooks G. N., 1965, J IND ENG, V16
[6]  
Burbidge JL., 1975, INTRO GROUP TECHNOLO
[7]  
Conway R, 1967, THEORY SCHEDULING
[8]  
DAY JE, 1970, NAVAL RES LOGIST Q, V17
[9]  
Durie F.R.E., 1970, PRODUCTION ENG, V49, P51
[10]   SET-UP TIMES IN CYCLIC AND ACYCLIC GROUP TECHNOLOGY SCHEDULING SYSTEMS [J].
FOO, FC ;
WAGER, JG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1983, 21 (01) :63-73