共 30 条
[1]
Anderson J.C., Schroeder R.G., Tupy S.E., White E.M., Material requirements planning systems: The state of the art, Production and Inventory Management, 23, 4, pp. 51-63, (1982)
[2]
Baker K., An experimental study of the effectiveness of rolling schedules in production planning, Decision Sciences, 8, pp. 19-27, (1977)
[3]
Berry W.L., Lot-sizing procedures for requirements planning systems: A framework for analysis, Production and Inventory Management, 13, 2, pp. 19-33, (1972)
[4]
Blackburn J.D., Kropp D.H., Millen R.A., MRP system nervousness: Causes and cures, Engineering Costs and Production Economics, 9, pp. 141-146, (1985)
[5]
Blackburn J.D., Kropp D.H., Millen R.A., A comparison of strategies to dampen nervousness in MRP systems, Management Science, 32, pp. 413-429, (1986)
[6]
Blackburn J.D., Millen R.A., Heuristic lot-sizing performance in a rolling-schedule environment, Decision Sciences, 11, pp. 691-701, (1980)
[7]
Blackburn J.D., Millen R.A., The impact of a rolling schedule in a multilevel MRP system, Journal of Operations Management, 2, pp. 125-135, (1982)
[8]
Blackburn J.D., Millen R.A., Improved heuristic for multi-stage requirements planning systems, Management Science, 28, pp. 44-56, (1982)
[9]
Boe W.J., Yilmaz C., The incremental order quantity, Production and Inventory Management, 24, 2, pp. 95-100, (1983)
[10]
Carlson R.C., Beckman S.L., Kropp D.H., The effectiveness of extending the horizon in rolling production scheduling, Decision Sciences, 13, pp. 129-146, (1982)