PRIORITY SCHEDULING RULES FOR REPAIRABLE INVENTORY SYSTEMS

被引:39
作者
HAUSMAN, WH [1 ]
SCUDDER, GD [1 ]
机构
[1] UNIV MINNESOTA,SCH MANAGEMENT,MINNEAPOLIS,MN 55455
关键词
Compilation and indexing terms; Copyright 2025 Elsevier Inc;
D O I
10.1287/mnsc.28.11.1215
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
AIRCRAFT ENGINES, JET AND TURBINE - INVENTORY CONTROL
引用
收藏
页码:1215 / 1232
页数:18
相关论文
共 29 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   CRITICAL RATIO SCHEDULING - EXPERIMENTAL ANALYSIS [J].
BERRY, WL ;
RAO, V .
MANAGEMENT SCIENCE, 1975, 22 (02) :192-201
[3]   CRITICAL RATIO SCHEDULING - EXPERIMENTAL-ANALYSIS - REPLY [J].
BERRY, WL .
MANAGEMENT SCIENCE, 1977, 23 (12) :1360-1361
[4]  
Conway R, 1967, THEORY SCHEDULING
[5]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[6]   CRITICAL RATIO SCHEDULING - EXPERIMENTAL-ANALYSIS [J].
GRAVES, SC .
MANAGEMENT SCIENCE, 1977, 23 (12) :1358-1359
[7]   SPARES PROVISIONING FOR REPAIRABLE ITEMS - CYCLIC QUEUES IN LIGHT TRAFFIC [J].
GROSS, D ;
INCE, JF .
AIIE TRANSACTIONS, 1978, 10 (03) :307-314
[8]  
GROSS D, 1981, UNPUB AMPLE SERVICE
[9]  
GROSS D, 1975, T322 G WASH U SCH EN
[10]  
GROSS D, 1978, T376 G WASH U PROGR