How organisational culture impacts on the implementation of ISO 14001: 1996 - a UK multiple-case view

被引:23
作者
Balzarova, Michaela A. [1 ]
Castka, Pavel [2 ]
Bamber, Christopher J. [3 ]
Sharp, John M. [1 ]
机构
[1] Univ Salford, Salford, Lancs, England
[2] Univ Canterbury, Christchurch, New Zealand
[3] OLC Europe Ltd, Preston, Lancs, England
关键词
Quality standards; Organizational culture; Environmental management; Qualitative research; United Kingdom;
D O I
10.1108/17410380610639524
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - To investigate the influence of organisational culture on the implementation of ISO 14001:1996 environmental management system (EMS) standard in two manufacturing case study organisations (CSOs). Design/methodology/approach - This research is a case study action research conducted in two manufacturing organisations in the UK. Findings - The hassles authors identified a framework of four dimensions of organisational culture that play an important role during the ISO 14001:1996 implementation process of. These are recognised as people, process, structure and environment. Research limitation/implications - The study is limited to two case organisations, which are based in the UK. Practical implications - The four dimensions of organisational culture identified through this research can help practitioners to coordinate their ISO 14000:1996 implementation projects. Originality/value - This paper fulfils the need to improve the understanding of the impact of the organisational culture on ISO14001:1996 implementation projects within the manufacturing environment.
引用
收藏
页码:89 / +
页数:16
相关论文
共 51 条
[1]  
[Anonymous], 1981, THEORY Z
[2]  
[Anonymous], 1994, REAL WORLD RES RESOU
[3]  
[Anonymous], 2001, J CLEAN PROD
[4]  
Armstrong, 2000, INT J ENTREPRENEURIA, P227, DOI DOI 10.1108/13552550010355118
[5]   Critical factors for implementing ISO 14001 standard in United States industrial companies [J].
Babakri, KA ;
Bennett, RA ;
Franchetti, M .
JOURNAL OF CLEANER PRODUCTION, 2003, 11 (07) :749-752
[6]  
Bamber C. J., 2000, Integrated Manufacturing Systems, V11, P454, DOI 10.1108/09576060010349758
[7]  
Bamber C. J., 2003, THESIS
[8]  
Beer M., 1980, ORG CHANGE DEV SYSTE
[9]  
Boys K., 2004, International Journal of Quality Reliability Management, V21, P841, DOI 10.1108/02656710410551737
[10]  
Bryman A., 1989, RES METHODS ORG STUD