OPTIMIZING PUMPING STRATEGIES FOR CONTAMINANT STUDIES AND REMEDIAL ACTIONS

被引:8
作者
KEELY, JF [1 ]
机构
[1] US EPA,ROBERT S KERR ENVIRONM RES LAB,ADA,OK 74820
关键词
D O I
10.1111/j.1745-6592.1984.tb00888.x
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
引用
收藏
页码:63 / 74
页数:12
相关论文
共 6 条
[1]   GROUNDWATER QUALITY AT A CREOSOTE WASTE SITE [J].
BEDIENT, PB ;
RODGERS, AC ;
BOUVETTE, TC ;
TOMSON, MB ;
WANG, TH .
GROUND WATER, 1984, 22 (03) :318-329
[2]  
Fetter Jr C.W., 1981, GROUNDWATER MONIT RE, V1, P28, DOI [10.1111/j.1745-6592.1981.tb00813.x, DOI 10.1111/J.1745-6592.1981.TB00813.X]
[3]  
JAVANDEL I, 1984, WATER RESOURCES MONO, V10
[4]  
Jorgensen D.G., 1982, GROUNDW MONIT REMEDI, V2, P40
[5]   VELOCITY PLOTS AND CAPTURE ZONES OF PUMPING CENTERS FOR GROUNDWATER INVESTIGATIONS [J].
KEELY, JF ;
TSANG, CF .
GROUND WATER, 1983, 21 (06) :701-714
[6]  
[No title captured]