FURTHER DEVELOPMENT OF INTEGER PROGRAMMING IN EARTHWORK OPTIMIZATION

被引:49
作者
JAYAWARDANE, AKW
HARRIS, FC
机构
[1] Civ. Engrg. Dept., Univ. of Technology, Loughborough
[2] The Polytechnic, Wolverhampton
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 01期
关键词
D O I
10.1061/(ASCE)0733-9364(1990)116:1(18)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The objective of existing linear programming methods of earthwork-system optimization in road construction has been either minimizing the cost or maximizing profit, generally without considering the project duration. This paper develops a linear programming model incorporating the project duration. The model attempts to optimize a comprehensive earthmoving system in road construction by comparing alternative fleets (from available fleets) to provide an optimum material distribution and appropriate plant fleets to complete a project within the specified time. The situations where different degrees of compaction, availability of various soil strata at cut sections and borrow pits, and selection of borrow /disposal sites are also incorporated. Among the possible extensions, equipment sharing between fleets and sequence of operations present at cut and fill sections are examined. The validity of the model is demonstrated by applying it to a numerical example, providing additional tools to the management such as the minimum project-completion time, the cheapest project cost and corresponding duration achievable with available resources. © ASCE.
引用
收藏
页码:18 / 34
页数:17
相关论文
共 12 条
[1]  
Anderson J., Mikhail E., Introduction to Surveying, (1985)
[2]  
Bernold L.E., Low level artificial intelligence and computer simulation to plan and control earthmoving operations, Earthmoving and Heavy Equipment, (1986)
[3]  
Easa S.M., Earthwork allocations with nonconstant unit costs, J. Constr. Engrg. Mgmt, 113, 1, pp. 34-50, (1987)
[4]  
Easa S.M., Earthwork allocations with linear unit costs, J. Constr. Engrg. Mgmt, 114, 4, pp. 641-655, (1988)
[5]  
Hickerson T., Route Location and Design, (1964)
[6]  
Mayer R.H., Stark R.M., Earthmoving logistics, J. Constr. Div, 107, 2, pp. 297-312, (1981)
[7]  
Nandgaonkar S.M., Earthwork transportation allocations: Operations research, J. Constr. Div, 107, 2, pp. 373-392, (1981)
[8]  
Oglesby C., Highway Engineering, (1982)
[9]  
SCICONIC/VM User Guide Version 1.40, (1986)
[10]  
Shaffer L.R., Analytical methods in transportation: Planning a grading operation for least total cost, J. Engrg. Mech. Div, 89, 6, pp. 47-66, (1963)