共 16 条
[1]
Bauer A., Bowden R., Browne J., Duggan J., Lyons G., Shop Floor Control System, (1991)
[2]
Blackstone J.H., Phillips D.T., Hogg G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, 1, pp. 27-45, (1982)
[3]
Buffa E.S., Operations Management: Problems and Models, Second Edition, (1968)
[4]
Bunag P., Smith B., A multifactor priority rule for job shop scheduling using a computer search, IIE Transactions, 17, 2, pp. 142-146, (1985)
[5]
Conway R.W., Maxwell W.L., Network dispatching by shortest operation discipline, Operation Research, 10, (1962)
[6]
Elvers D.A., Treleven M.D., Job-shop vs. Hybrid flow-shop routing in a dual resource constrained system, Decision Science, 16, pp. 213-222, (1985)
[7]
Fry T.D., Oliff M.D., Minor M.D., Leong G.K., The effect of product structure and sequencing rules on assembly-shop performance, International Journal of Production Research, 27, pp. 671-686, (1989)
[8]
Fry T.D., Philipoom P.R., Markland R.E., Due date assignment in a multistage job shop, IIE Transactions, 21, pp. 153-161, (1989)
[9]
Gere W.S., Heuristics in job shop scheduling, Management Science, 13, 3, pp. 167-190, (1966)
[10]
Holloway C.A., Nelson R.T., Job shop scheduling with due dates and overtime capability, Management Science, 21, 1, pp. 68-78, (1974)