SCHEDULING RESCHEDULING IN THE MANUFACTURING OPERATING SYSTEM ENVIRONMENT

被引:102
作者
YAMAMOTO, M
NOF, SY
机构
[1] Purdue Univ, West Lafayette, IN, USA, Purdue Univ, West Lafayette, IN, USA
关键词
COMPUTER AIDED MANUFACTURING - PRODUCTION ENGINEERING;
D O I
10.1080/00207548508904739
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Experiments to evaluate the total production time of a computerized manufacturing system with breakdowns under scheduling/rescheduling have yielded advantages of between 2. 5% to 7. 0% compared to fixed sequencing and priority despatching procedures, respectively. Computation times required for the scheduling procedures on a CDC 6500/6600 have also been studied. The scheduling/rescheduling procedure for an actual facility required less than two minutes, and the computation time can be regulated by the selection of parameters in an approximate method of scheduling.
引用
收藏
页码:705 / 722
页数:18
相关论文
共 16 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   PRACTICAL APPROACH TO PRODUCTION SCHEDULING [J].
BESTWICK, PF ;
LOCKYER, KG .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1979, 17 (02) :95-109
[3]   MODELS FOR UNDERSTANDING FLEXIBLE MANUFACTURING SYSTEMS [J].
BUZACOTT, JA ;
SHANTHIKUMAR, JG .
AIIE TRANSACTIONS, 1980, 12 (04) :339-350
[4]  
Conway R, 1967, THEORY SCHEDULING
[5]   INTERACTIVE SCHEDULING - HISTORICAL SURVEY AND STATE OF THE ART [J].
GODIN, VB .
AIIE TRANSACTIONS, 1978, 10 (03) :331-337
[6]   INTERACTIVE SCHEDULING OF A GENERALIZED FLOWSHOP .2. DEVELOPMENT OF COMPUTER-PROGRAMS AND FILES [J].
HODGSON, TJ ;
MCDONALD, GW .
INTERFACES, 1981, 11 (03) :83-88
[8]  
KERRY TM, 1980, NOV P AUT W SOC MAN, P179
[9]  
MATHER H, 1977, PROD INVENT MANAG, P60
[10]   CONTROL AND DECISION SUPPORT IN AUTOMATIC MANUFACTURING SYSTEMS [J].
NOF, SY ;
WHINSTON, AB ;
BULLERS, WI .
AIIE TRANSACTIONS, 1980, 12 (02) :156-169