A LOAD FLOW BASED METHOD FOR CALCULATING EMBEDDED, INCREMENTAL AND MARGINAL COST OF TRANSMISSION CAPACITY

被引:55
作者
KOVACS, RR
LEVERETT, AL
机构
[1] Southern Company Services, Inc., Birmingham, Alabama, 35202
关键词
TRANSMISSION ACCESS; TRANSMISSION PRICING; WHEELING TRANSACTIONS; LONG-RUN COST OF TRANSMISSION CAPACITY;
D O I
10.1109/59.317601
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes the principles of a load flow based method for allocating the cost of transmission capacity. The method estimates the usage of each transmission facility with cost defined on a per facility basis. Embedded, incremental and marginal cost of transmission capacity are defined and compared to each other. A discussion of other load flow based methods and their application to marginal cost is included.
引用
收藏
页码:272 / 277
页数:6
相关论文
共 6 条
[1]  
LIVELY MB, 1989, PUBLIC UTILITIE 1221
[2]  
SCHWEPPE FC, 1988, SPOT PRICING ELECTRI
[3]  
Shirmohammadi D., 1989, IEEE T POWER SYSTEMS, V4
[4]  
1990, CASE88E238 NEW YORK
[5]  
1989, ELECTRICITY TRANSMIS
[6]  
1985, CURRENT PRACTICE EME