MULTI-PROJECT SCHEDULING - CATEGORIZATION OF HEURISTIC RULES PERFORMANCE

被引:177
作者
KURTULUS, I [1 ]
DAVIS, EW [1 ]
机构
[1] UNIV VIRGINIA,GRAD SCH BUSINESS ADM,CHARLOTTESVILLE,VA 22903
关键词
D O I
10.1287/mnsc.28.2.161
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:161 / 172
页数:12
相关论文
共 21 条
[1]  
CONWAY RW, 1965, J IND ENGINEERING, V16, P228
[2]  
Davis E. W., 1975, AIIE Transactions, V7, P132, DOI 10.1080/05695557508974995
[3]  
Davis E. W., 1973, AIIE T, V5, P297
[4]  
DAVIS EW, 1966, J IND ENGINEERING, V17, P177
[5]   COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
DAVIS, EW ;
PATTERSON, JH .
MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (08) :944-955
[6]  
DAVIS EW, 1969, THESIS YALE U
[7]  
ELMAGHRABY SE, 1977, ACTIVITY NETWORKS
[8]  
FENDLEY LG, 1968, J IND ENGINEERING, V19, P505
[9]  
HOLLANDER M, 1973, NONPARAMETRIC STATIS
[10]  
JENETT E, 1970, PROJECT MANAGEMENT Q, V1, P10