共 22 条
[1]
Buhoin T.A., The gamma distribution and inventory control, Operational Research Quarterly, 23, 3, pp. 507-525, (1975)
[2]
Cadley J.A., Heintz H.E., Allocco L.V., Insights from simulating JIT manufacturing, Interfaces, 19, 2, pp. 88-97, (1989)
[3]
Ebrahimpour M., Fathi B., Dynamic simulation of a Kanban production inventory system, International Journal of Operations and Production Management, 5, 1, pp. 5-14, (1985)
[4]
Fallon D., Browne J., Simulating just-in-time systems, International Journal of Operations and Production Management, 8, 6, pp. 30-45, (1988)
[5]
Gravel M.L., Price W.L., Using the Kanban in a job shop environment, International Journal of Production Research, 26, 6, pp. 1105-1118, (1988)
[6]
Gupta Y.P., Gupta M.C., A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system, International Journal of Production Research, 27, 2, pp. 309-352, (1989)
[7]
Hillier F.S., Boling R.W., On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times, Management Science, 25, 8, pp. 721-728, (1979)
[8]
Huang P.Y., Rees L.P., Taylor Iii B.W., A simulation of the Japanese just-in-time technique (With kanbans) for a multiline, multistage production system, Decision Sciences, 14, 3, pp. 326-344, (1983)
[9]
(1987)
[10]
Johnson N.L., Kotz S., Continuous Univariate Distributions-1, (1970)