SEQUENTIAL MONTE-CARLO SIMULATION FOR COMPOSITE POWER-SYSTEM RELIABILITY-ANALYSIS WITH TIME-VARYING LOADS

被引:148
作者
SANKARAKRISHNAN, A
BILLINTON, R
机构
[1] Power Systems Research Group, University of Saskatchewan, Saskatoon
关键词
D O I
10.1109/59.466491
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper illustrates the development and utilization of an annual chronological load carve for each load bus in a composite generation and transmission system and a sequential Monte Carlo simulation approach for composite system reliability assessment. Antithetic variates as a variance reduction technique has been applied to the simulation model to increase the efficiency of the simulation, An approximate method using a load duration curve of the system load and an enumeration process have been applied to the developed load model and the results are compared in this paper.
引用
收藏
页码:1540 / 1545
页数:6
相关论文
共 17 条
[1]  
ALLAN RN, P JOINT INT IEEE POW, P622
[2]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[3]  
[Anonymous], 1979, MONTE CARLO METHODS
[4]   A SYSTEM STATE TRANSITION SAMPLING METHOD FOR COMPOSITE SYSTEM RELIABILITY EVALUATION [J].
BILLINTON, R ;
LI, W .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (03) :761-770
[5]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[6]  
BILLINTON R, 1994, IEE P C, V138
[7]  
Billinton R., 1984, RELIABILITY EVALUATI, DOI [10.1007/978-1-4615-7731-7, DOI 10.1007/978-1-4615-7731-7]
[8]  
CUNHA SHF, 1985, IEEE T POWER AP SYST, V104, P2657, DOI 10.1109/TPAS.1985.319106
[9]  
Law AM., 2007, SIMULATION MODELING, V4
[10]  
NOFERI P, 1975, 1975 P ANN REL MAINT, P449