FORMAL DEVELOPMENT OF LINE-OF-BALANCE TECHNIQUE

被引:39
作者
ALSARRAJ, ZM
机构
[1] King Saud Univ., Riyadh 11413
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1990年 / 116卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1990)116:4(689)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Highway construction, housing projects, long bridges, and many other types of construction projects are characterized by repetitive operations. Linear scheduling techniques are known to be the most suitable methods for the overall management of such types of construction projects. The line-of-balance technique is one of these linear scheduling methods using known scheduling methods such as the critical path method (CPM), program evaluation and review technique (PERT), and bar chart, and it does not replace them. A preliminary survey of literature reveals that the method has not been formalized enough to be presented by a body of well-tested algorithms. As a consequence, its use in construction project management has been very limited and no attempts have been made for its computerization. This paper formalizes the line-of-balance method and develops its algorithms. The end result is a method suitable for the management of complex construction projects with repetitive activities. As such, it provides scheduling, resource management, project analysis, and project control. © ASCE.
引用
收藏
页码:689 / 704
页数:16
相关论文
共 7 条
[1]  
Arditi D., Albulak M.Z., Line of balance scheduling in pavement construction, J. Constr. Engrg. and Mgmt, 112, 3, pp. 411-424, (1986)
[2]  
Carr R.I., Meyer W.L., Planning construction of repetitive building units, J. Constr. Div, 100, 3, pp. 403-412, (1974)
[3]  
Khisty C.J., The application of the line of balance technique to the construction industry, Indian Concrete J, 44, 7, pp. 319-320, (1970)
[4]  
Line of Balance Technology, (1962)
[5]  
Lumsden P., The Line of Balance Method, (1968)
[6]  
O'Brien J.J., Network scheduling variations for repetitive work, Paper Presented at the ASCE Spring Convention, (1984)
[7]  
O'Brien J.J., VPM scheduling for high-rise buildings, J. Constr. Div, 101, 4, pp. 895-905, (1975)