SCHEDULING A 2-MACHINE ROBOTIC CELL - A SOLVABLE CASE

被引:16
作者
LEVNER, E
KOGAN, K
LEVIN, I
机构
[1] TEL AVIV UNIV,CTR TECHNOL EDUC,DEPT AUTOMATED SYST,IL-58102 HOLON,ISRAEL
[2] TEL AVIV UNIV,DEPT IND ENGN,IL-69978 TEL AVIV,ISRAEL
关键词
SCHEDULING; ROBOTIC CELL; TANDEM MACHINES; OPTIMIZATION;
D O I
10.1007/BF02099699
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The paper deals with the scheduling of a robotic cell in which jobs are processed on two tandem machines. The job transportation between the machines is done by a transportation robot. The robotic cell has limitations on the intermediate space between the machines for storing the work-in-process. What complicates the scheduling problem is that the loading/unloading operation times are non-negligible. Given the total number of operations n, an optimal O(n log n)-time algorithm is proposed together with the proof of optimality.
引用
收藏
页码:217 / 232
页数:16
相关论文
共 10 条
[1]  
BELENKII AS, 1991, AUTO REMOTE CONTR, V10, P1
[2]   NEW TRENDS IN MACHINE SCHEDULING [J].
BLAZEWICZ, J ;
FINKE, G ;
HAUPT, R ;
SCHMIDT, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :303-317
[3]  
Johnson S.M., 1954, NAV RES LOG, V1, P61, DOI [10.1002/nav.3800010110, DOI 10.1002/NAV.3800010110]
[4]   AUTOMATED 2-MACHINE FLOWSHOP SCHEDULING - A SOLVABLE CASE [J].
KISE, H ;
SHIOYAMA, T ;
IBARAKI, T .
IIE TRANSACTIONS, 1991, 23 (01) :10-16
[5]  
KUSIAK A, 1986, FLEXIBLE MANUFACTURI, P521
[6]  
LAWLER EL, 1993, LOGISTICS PRODUCTION, V4
[7]  
LEVNER EV, 1969, AUTO REMOTE CONTR, V11, P1972
[8]  
PANWALKAR SS, 1991, J OPER RES SOC, V42, P609
[9]  
STECKE RE, 1986, FLEXIBLE MANUFACTURI
[10]   SCHEDULING PARTS IN A COMBINED PRODUCTION-TRANSPORTATION WORK CELL [J].
STERN, HI ;
VITNER, G .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1990, 41 (07) :625-632