The effects of dynamic residential load participation: penetration levels for operational impact on reliability

被引:2
作者
Harper, Steven R. [1 ]
Thurston, Deborah L. [1 ]
Krein, Philip T. [2 ]
机构
[1] Univ Illinois, Dept Ind & Enterprise Syst Engn, 104 S Mathews Ave, Urbana, IL 61801 USA
[2] Univ Illinois, Dept Elect & Comp Engn, Urbana, IL 61801 USA
基金
美国国家科学基金会;
关键词
load shedding; electrical power systems; system reliability; systems engineering; load management; reliability management; reliability estimation; residential load control;
D O I
10.1504/IJCIS.2007.011552
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Building an electrical load system that uses prioritised loads has been suggested as a means of approaching the overloading of the aging electrical infrastructure and thus increasing system reliability. In this paradigm, local controls would shut off electrical loads when overload conditions are being approached in the electrical power system. An unresolved question is how these systems might be configured and whether the deployment of residential load control will make a difference. This paper provides answers to both of these questions by suggesting several methods of deploying residential load control and determining the level of participation needed for each to make a difference in overall system reliability. The approach suggested was shown to improve the reliability of electrical power delivery, even under very modest levels of participation. Under emergency conditions with 10% of load available for control, there is a factor of ten improvement in electrical power system reliability.
引用
收藏
页码:221 / 234
页数:14
相关论文
共 16 条
[1]  
Abraham D.S.S., 1993, MEET THE PRESS
[2]  
Akashi Y., 2004, ENERGY SAVINGS LOAD
[3]  
[Anonymous], 1979, IEEE T POWER AP SYST, V98, P2047, DOI 10.1109/TPAS.1979.319398
[4]  
[Anonymous], FIN REP AUG 14 2003
[5]  
Apt J., 2004, ELECT BLACKOUTS SYST
[6]   A RELIABILITY TEST SYSTEM FOR EDUCATIONAL PURPOSES - BASIC DATA [J].
BILLINTON, R ;
KUMAR, S ;
CHOWDHURY, N ;
CHU, K ;
DEBNATH, K ;
GOEL, L ;
KHAN, E ;
KOS, P ;
NOURBAKHSH, G ;
OTENGADJEI, J .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1989, 4 (03) :1238-1244
[7]  
Billinton R, 1994, RELIABILITY ASSESSME
[8]  
Bishop M. T., 1999, LINE, P7
[9]  
Cowart R, 2003, DIMENSIONS DEMAND RE
[10]  
EIA, 2003, OFF EN STAT US GOV