2 MACHINE FLOW SHOP SCHEDULING PROBLEMS WITH SEQUENCE DEPENDENT SETUP TIMES - DYNAMIC-PROGRAMMING APPROACH

被引:47
作者
CORWIN, BD
ESOGBUE, AO
机构
[1] UNIV MARYLAND,COLLEGE PK,MD
[2] GEORGIA INST TECHNOL,ATLANTA,GA
关键词
D O I
10.1002/nav.3800210311
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:515 / 524
页数:10
相关论文
共 17 条
[1]  
Agin N., 1966, MANAG SCI, V13, P176, DOI [10.1287/mnsc.13.4.B176, DOI 10.1287/MNSC.13.4.B176]
[3]   DYNAMIC PROGRAMMING TREATMENT OF TRAVELLING SALESMAN PROBLEM [J].
BELLMAN, R .
JOURNAL OF THE ACM, 1962, 9 (01) :61-&
[4]  
Bellman R. E., 1962, APPL DYNAMIC PROGRAM
[5]   TRAVELING SALESMAN PROBLEM - A SURVEY [J].
BELLMORE, M ;
NEHAUSE.GL .
OPERATIONS RESEARCH, 1968, 16 (03) :538-&
[6]  
BUZZACOTT JA, 1971, NAV RES LOG QUART, V18, P75
[7]   A GENERALIZED MACHINE-SCHEDULING ALGORITHM [J].
CHARLTON, JM ;
DEATH, CC .
OPERATIONAL RESEARCH QUARTERLY, 1970, 21 (01) :127-&
[8]  
Conway R, 1967, THEORY SCHEDULING
[9]  
CORWIN BD, 1969, 150 CAS WEST RES U T
[10]  
Florian M., 1971, Management Science, V17, P782, DOI 10.1287/mnsc.17.12.B782