Conflicting factors in construction projects: Korean perspective

被引:94
作者
Acharya, Nirmal [1 ]
Lee, Young [1 ]
Im, Hae [2 ]
机构
[1] Pukyong Natl Univ, Dept Civil Engn, Pusan, South Korea
[2] Pukyong Natl Univ, Dept Interdisciplinary CEM, Pusan, South Korea
关键词
Construction operations; Conflict; Conflict management; South Korea;
D O I
10.1108/09699980610712364
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - The purpose of this article is to identify and explore pertinent conflicting factors in construction projects; which would be helpful for project planners and implementers in assessing and taking proactive measures for reducing the adverse effect of conflict. Design/methodology/approach - To achieve the study objectives, a 43-item questionnaire survey in a five-point Likert scale was carried out to collect professionals' experience on conflicting activities in Korean construction projects. Responses from 124 professionals working for owners, consultants and contractors were analyzed. Furthermore, ten face-to face interviews were also carried out to ratify the findings from the field survey. Later, analytical hierarchical process method was employed to find out the importance weighting as well as responsible party for the perceived conflicts. Findings - This study has found out six critical construction conflicting factors pertinent in Korean context. These factors with importance weighting are: differing site condition (24.1 percent), public interruption (22.5 percent), differences in change order evaluation (21 percent), design errors (17.1 percent), excessive contract quantities variation (8.2) and double meaning of specifications (7.1 percent). The study has revealed that owner (35.6 percent) and consultant (34.18 percent) are mostly responsible parties for conflicts in construction projects. Originality/value - As the previous researches have been indicating increase in conflicts in construction field, this paper is very topical at the moment. This work has tried to explore the underlying problems of the construction field. The study provides field level experiences from which the inexperience construction site professionals could learn the instances of conflicts and not repeat the mistakes in their projects.
引用
收藏
页码:543 / +
页数:26
相关论文
共 21 条
[1]  
Acharya Nirmal Kumar, 2006, KSCE Journal of Civil Engineering, V10, P165
[2]  
Awakul P., 2002, CONSTRUCTION MANAGEM, V20, P365, DOI [DOI 10.1080/01446190210133456, 10.1080/01446190210133456]
[3]  
Barrie D., 1992, PROFESSIONAL CONSTRU
[4]   Disputes and dispute resolution systems in Sino-Foreign Joint Venture construction projects in China [J].
Chan, EHW ;
Suen, HCH .
JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2005, 131 (02) :141-148
[5]  
CHO Y, 2003, CONSTRUCTION MANAGEM, V21, P671, DOI DOI 10.1080/0144619032000093297
[6]  
Epstein R.C., 2004, CONSTRUCTION CONTRAC
[7]  
Fenn P., 1997, CONSTRUCT MANAGE EC, V15, P513, DOI DOI 10.1080/014461997372719
[8]  
Fenn P., 2002, M SOC CONSTR LAW S N
[9]   A better way to estimate and mitigate disruption [J].
Finke, MR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1998, 124 (06) :490-497
[10]  
Fisk E. R., 2000, CONSTRUCTION PROJECT