PLANNED LEADTIMES FOR SERIAL PRODUCTION SYSTEMS

被引:34
作者
YANO, CA
机构
关键词
D O I
10.1080/07408178708975400
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:300 / 307
页数:8
相关论文
共 11 条
[1]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[2]   A SIMULATION-BASED EXPERIMENTAL INVESTIGATION OF SUPPLY TIMING UNCERTAINTY IN MRP SYSTEMS [J].
GRASSO, ET ;
TAYLOR, BW .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1984, 22 (03) :485-497
[3]  
GRAVES SC, 1985, MIT155284 SLOAN SCH
[4]  
KANET JJ, 1984, INT J PROD RES, V22, P41, DOI 10.1080/00207548408942428
[5]   LOT-SIZING IN MULTI-ITEM MULTI-MACHINE JOB SHOPS [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
IIE TRANSACTIONS, 1985, 17 (03) :290-298
[6]   LOT-SIZING AND LEAD-TIME PERFORMANCE IN A MANUFACTURING CELL [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S ;
FREEMAN, S .
INTERFACES, 1985, 15 (02) :1-9
[7]  
Luenberger D. G., 1973, INTRO LINEAR NONLINE
[8]   DYNAMICALLY ADJUSTING THE NUMBER OF KANBANS IN A JUST-IN-TIME PRODUCTION SYSTEM USING ESTIMATED VALUES OF LEADTIME [J].
REES, LP ;
PHILIPOOM, PR ;
TAYLOR, BW ;
HUANG, PY .
IIE TRANSACTIONS, 1987, 19 (02) :199-207
[9]  
WEEKS JK, 1981, 21 ANN C P AM PROD I, P177
[10]  
Whybark D.C., 1976, DECISION SCI, V7, P595, DOI DOI 10.1111/J.1540-5915.1976.TB00704.X