OPERATION RESEARCH STATISTICS AND ECONOMICS .286. OPENSHOP AND FLOWSHOP SCHEDULING TO MINIMIZE SUM OF COMPLETION TIMES

被引:33
作者
ADIRI, I
AMIT, N
机构
关键词
D O I
10.1016/0305-0548(84)90016-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:275 / 284
页数:10
相关论文
共 9 条
[1]  
ACHUGBUE JO, 1979, TR798 U ALB DEP COMP
[2]  
ADIRI I, UNPUB NAVAL RES LOGI
[3]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[4]  
HEFETZ N, UNPUB NAVAL RES LOGI
[5]  
Lenstra J. K., 1977, MATH CTR TRACTS, V69
[6]   SCHEDULING WITH DEADLINES AND LOSS FUNCTIONS [J].
MCNAUGHTON, R .
MANAGEMENT SCIENCE, 1959, 6 (01) :1-12
[7]  
Panwalkar S. S., 1976, International Journal of Production Research, V14, P631, DOI 10.1080/00207547608956381
[8]  
Rinnooy Kan AHG, 1976, MACHINE SCHEDULING P
[9]  
SARIN SC, 1978, 2 MACHINE MEAN FLOWT