INTERACTION BETWEEN SUBCYCLES - ONE KEY TO IMPROVED METHODS

被引:50
作者
HOWELL, G
LAUFER, A
BALLARD, G
机构
[1] Univ. of New Mexico, Albuquerque
[2] Nat. Bldg. Res. Inst., Technion-Inst. of Tech.
[3] Oakland, CA 94619
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 1993年 / 119卷 / 04期
关键词
D O I
10.1061/(ASCE)0733-9364(1993)119:4(714)
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The relationship of one subcycle to another can be complex. Productivity suffers when the output of one subcycle delays a following step or when resources required for one subcycle are engaged in another. Isolating subcycles from immediate interaction with other subcycles is an important principle in the design and improvement of work methods. While interaction cannot be eliminated, the negative effect of immediate interactions can be reduced with careful provision of buffers and shared resources. Five cases demonstrate different aspects of this concept. A review of 31 cases of performance improvement shows that reducing the immediacy of interactions between subcycles is an effective method used by supervisors to cope with the uncertainty. Reducing immediate interaction through the provision of buffers and/or shared resources will be the most effective technique for eliminating performance-reducing interactions until greater control is achieved over the rates of supply and use of resources. A process for the design and improvement of work methods based on these concepts is offered.
引用
收藏
页码:714 / 728
页数:15
相关论文
共 17 条
[1]  
Adrian J.J., Construction Productivity Improvement, (1987)
[2]  
Bernhold L., Simulation of nonsteady construction processes, J. Constr. Engrg. and Mgmt.,, 115, 2, pp. 163-178, (1989)
[3]  
Brandlhuber T., Complexity and coupling in construction operations, (1991)
[4]  
Borcherding J.D., Sebastian S.J., Samelson N.M., Improving motivation and productivity on large projects, J. Constr. Div.,, 106, 1, pp. 73-89, (1980)
[5]  
Chang L., Borcherding J., Craftsman questionnaire sampling, J. Constr. Engrg. and Mgmt.,, 112, 4, pp. 543-556, (1986)
[6]  
Emery J.C., Integrated information systems and their effects on organizational structure, Information Systems and Organizational Structure, (1975)
[7]  
Goldratt E., The Goal, (1985)
[8]  
Halpin D.W., Woodhead R.W., Design of Construction and Process Operations, (1976)
[9]  
Howell G.A., Learn from experience, Electrical Contractor, Jun, pp. 27-29, (1990)
[10]  
Koskela L., Process improvement and automation in construction: Opposing or complementary approaches?, Proc. 9th Int. Symp. on Automation and Robotics in Constr., pp. 105-112, (1992)