A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING

被引:435
作者
UZSOY, R [1 ]
LEE, CY
MARTINVEGA, LA
机构
[1] PURDUE UNIV, SCH IND ENGN, W LAFAYETTE, IN 47907 USA
[2] UNIV FLORIDA, DEPT IND & SYST ENGN, GAINESVILLE, FL 32611 USA
[3] NATL SCI FDN, WASHINGTON, DC 20550 USA
基金
美国国家科学基金会;
关键词
D O I
10.1080/07408179208964233
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Although the national importance of the semiconductor industry is widely acknowledged, it is only recently that the production planning and scheduling problems encountered in this environment have begun to be addressed using industrial engineering and operations research techniques. These problems have several features that make them difficult and challenging: random yields and rework, complex product flows, and rapidly changing products and technologies. Hence their solution will contribute considerably to the theory and practice of production planning and control. In a two-part project we present a review of research in this area to date, discuss the applicability of the various approaches and suggest directions for future research. In this paper, Part I, we describe the characteristics of the semiconductor manufacturing environment and review models related to performance evaluation and production planning. Part II will review research on shop-floor control in this industry to date.
引用
收藏
页码:47 / 60
页数:14
相关论文
共 76 条
  • [1] ADIGA S, 1988, ESRC8820 U CAL RES R
  • [2] SIGNATURE ANALYSIS - SIMULATION OF INVENTORY, CYCLE TIME, AND THROUGHPUT TRADE-OFFS IN WAFER FABRICATION
    ATHERTON, RW
    DAYHOFF, JE
    [J]. IEEE TRANSACTIONS ON COMPONENTS HYBRIDS AND MANUFACTURING TECHNOLOGY, 1986, 9 (04): : 498 - 507
  • [3] ATHERTON RW, 1989, 1ST P INT SEM MAN SC
  • [4] AVRAM F, 1989, IN PRESS OPERATIONS
  • [5] BAI SX, 1990, OR23090 MIT RES REP
  • [6] BAI X, 1990, VLSI89518 MIT MEM
  • [7] BAI X, 1990, VLSI90604 MIT MICR R
  • [8] BAI X, 1990, 9TH P IEEE INT EL MA
  • [9] BAI X, 1990, 29TH P IEEE C DEC CO
  • [10] BAUM SS, 1991, 1991 WINTER SIMULATION CONFERENCE PROCEEDINGS, P448, DOI 10.1109/WSC.1991.185646