AN EXACT SOLUTION ALGORITHM FOR A CLASS OF PRODUCTION PLANNING AND SCHEDULING PROBLEMS

被引:2
作者
MADAN, MS [1 ]
GILBERT, KC [1 ]
机构
[1] UNIV TENNESSEE,KNOXVILLE,TN 37996
关键词
PRODUCTION PLANNING;
D O I
10.2307/2584550
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a formulation and an exact solution algorithm for a class of production planning and scheduling problems. The problem is one of optimally specifying production levels for each product in each period of the planning horizon. The objective is to minimize the sum of the set-up, regular time production, overtime and inventory holding costs. The problem has been formulated as a variation of fixed charge transportation problem. The problem discussed here is NP-hard in computational complexity. A numerical example is presented for better understanding of the algorithm.
引用
收藏
页码:961 / 970
页数:10
相关论文
共 7 条
[1]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[2]  
BILLINGTON PJ, 1984, MRP LOTSIZING BOTTLE
[3]  
GILBERT KC, 1991, J IIE T, V23, P282
[4]  
MADAN MS, 1988, THESIS U TENNESSEE
[5]   ALGORITHM FOR BOUNDED VARIABLE INTEGER PROGRAMMING PROBLEM [J].
TROTTER, LE ;
SHETTY, CM .
JOURNAL OF THE ACM, 1974, 21 (03) :505-513
[6]   DYNAMIC VERSION OF THE ECONOMIC LOT SIZE MODEL [J].
WAGNER, HM ;
WHITIN, TM .
MANAGEMENT SCIENCE, 1958, 5 (01) :89-96
[7]   NETWORK PROGRAMMING-MODELS FOR PRODUCTION SCHEDULING IN MULTI-STAGE, MULTI-ITEM CAPACITATED SYSTEMS [J].
ZAHORIK, A ;
THOMAS, LJ ;
TRIGEIRO, WW .
MANAGEMENT SCIENCE, 1984, 30 (03) :308-325