A NEW INTEGER PROGRAMMING FORMULATION FOR THE PERMUTATION FLOWSHOP PROBLEM

被引:11
作者
FRIEZE, AM
YADEGAR, J
机构
[1] UNIV LONDON QUEEN MARY COLL,DEPT COMP SCI & STAT,LONDON E1 4NS,ENGLAND
[2] UNIV LONDON QUEEN MARY COLL,DAP SUPPORT UNIT,LONDON E1 4NS,ENGLAND
关键词
D O I
10.1016/0377-2217(89)90276-2
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:90 / 98
页数:9
相关论文
共 28 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]   COMPARATIVE STUDY OF FLOW-SHOP ALGORITHMS [J].
BAKER, KR .
OPERATIONS RESEARCH, 1975, 23 (01) :62-73
[3]  
Bellman R., 1982, MATH ASPECTS SCHEDUL
[4]   NEW BOUND FOR MACHINE SCHEDULING [J].
BESTWICK, PF ;
HASTINGS, NAJ .
OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) :479-487
[5]   SOME APPLICATIONS OF BRANCH-AND-BOUND ALGORITHM TO MACHINE SCHEDULING PROBLEM [J].
BROWN, APG ;
LOMNICKI, ZA .
OPERATIONAL RESEARCH QUARTERLY, 1966, 17 (02) :173-&
[6]  
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[7]  
Conway R, 1967, THEORY SCHEDULING
[8]  
Ford L., 1962, FLOWS NETWORKS
[9]  
Garey M. R., 1976, Mathematics of Operations Research, V1, P117, DOI 10.1287/moor.1.2.117
[10]  
Garey M. R., 1979, COMPUTERS INTRACTIBI