THE ROLE OF DISCRETE-EVENT SIMULATION TECHNIQUES IN FINITE-CAPACITY SCHEDULING

被引:13
作者
ROY, R
MEIKLE, SE
机构
[1] University of Warwick, Coventry
关键词
SIMULATION; SCHEDULING; PRODUCTION;
D O I
10.1057/jors.1995.180
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Discrete event simulation is becoming an established tool in finite capacity scheduling. However, recent work on scheduling systems has concentrated on the development of different modelling approaches and tools, without proper examination of how they can be used to meet business objectives. This paper examines the role of scheduling in improving business performance and suggests possible considerations in the development and implementation of a finite capacity scheduler. It reviews the advantages and limitations of discrete event simulation as a modelling technique for scheduling, and argues the need for further research to develop more versatile tools. A simulation-based scheduling system incorporating bottleneck planning principles to maintain through-put with low inventory is described, as are the experiences gained during its implementation in a medium-sized press shop.
引用
收藏
页码:1310 / 1321
页数:12
相关论文
共 29 条
[1]  
ANDELSBERGER HH, 1991, J PROD INVENT MGMT, V32, P43
[2]  
*AT T IST LTD, 1993, PROV US MAN
[3]  
BONSIGNORIO F, 1988, 4TH P INT C SIM MAN, P107
[4]   THE SCHEDULE-SEQUENCING PROBLEM [J].
BOWMAN, EH .
OPERATIONS RESEARCH, 1959, 7 (05) :621-624
[5]  
DAREL EM, 1982, J MANUF SYST, V1, P77
[6]  
DUGAN J, 1988, 4TH P INT C SIM MAN, P177
[7]  
FIDDY E, 1981, 1981 C I MECH ENG LO
[8]  
FOX MS, 1987, CONSTRAINT DIRECTED
[9]  
Gere S.William., 1966, MANAGE SCI, V13, P167
[10]  
Goldratt E.M., 1984, GOAL EXCELLENCE MANU