ECHELON STOCK FORMULATION FOR MULTISTAGE LOT-SIZING WITH COMPONENT LEAD TIMES

被引:10
作者
CLARK, AR [1 ]
ARMENTANO, VA [1 ]
机构
[1] UNIV ESTADUAL CAMPINAS,FEE,DEPT ENGENHARIA SISTEMAS,BR-13081 CAMPINAS,SP,BRAZIL
关键词
D O I
10.1080/00207729308949592
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Material requirements planning of batch production in multi-stage manufacturing systems is discussed where component parts may have significant non-zero production or purchasing lead time. The presence of such lead time poses a synchronization problem for the rolling horizon planning of component part production in the system. The synchronization problem is analysed, discussed and modelled first for the case of assembly product structures where a component has a unique successor component. The analysis is then extended to the more complex case of general product structures where a component may have multiple successor components. The associated general structure multi-stage lot-sizing problem is then formulated as a mixed integer linear program first in terms of conventional stock, and then reformulated in terms of echelon stock. The echelon stock quantity of a component is its lead-time adjusted total system stock, counted both as a stand-alone component and as part of successor components. The echelon stock formulation permits the derivation of valid inequalities that can be used in an optimal solution method, and facilitates the development of a fast heuristic method for the capacitated problem.
引用
收藏
页码:1759 / 1775
页数:17
相关论文
共 12 条
[1]   OPTIMAL LOT-SIZING ALGORITHMS FOR COMPLEX PRODUCT STRUCTURES [J].
AFENTAKIS, P ;
GAVISH, B .
OPERATIONS RESEARCH, 1986, 34 (02) :237-249
[2]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[3]   OPTIMAL POLICIES FOR A MULTI-ECHELON INVENTORY PROBLEM [J].
CLARK, AJ ;
SCARF, H .
MANAGEMENT SCIENCE, 1960, 6 (04) :475-490
[4]  
CLARK AR, 1990, THESIS U CAMPINAS BR
[5]  
CLARK AR, 1990, 29TH P IEEE C DEC CO
[6]   ECONOMIC LOT SIZE DETERMINATION IN MULTI-STAGE ASSEMBLY SYSTEMS [J].
CROWSTON, WB ;
WAGNER, M ;
WILLIAMS, JF .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 19 (05) :517-527
[8]   OPTIMAL AND SYSTEM MYOPIC POLICIES FOR MULTI-ECHELON PRODUCTION-INVENTORY ASSEMBLY SYSTEMS [J].
SCHWARZ, LB ;
SCHRAGE, L .
MANAGEMENT SCIENCE SERIES A-THEORY, 1975, 21 (11) :1285-1294
[9]   OPTIMAL MULTILEVEL LOT SIZING FOR REQUIREMENTS PLANNING SYSTEMS [J].
STEINBERG, E ;
NAPIER, HA .
MANAGEMENT SCIENCE, 1980, 26 (12) :1258-1271
[10]  
Vollman T., 1988, MANUFACTURING PLANNI