A STUDY ON SURROGATE OBJECTIVES FOR LOADING A CERTAIN TYPE OF FLEXIBLE MANUFACTURING SYSTEMS

被引:17
作者
KIM, YD
机构
[1] Department of Industrial Engineering, Korea Advanced Institute of Science and Technology, Taejon, 305-701, 373-1 Gusong-dong, Yusong-gu
关键词
D O I
10.1080/00207549308956731
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Various objectives are used for the loading problem in flexible manufacturing systems. Because of the complexity, objectives commonly used in real fields may not be employed when solving the problem. This paper examines relationships between these objectives and ones that are relatively easy to deal with and are used in most research on this problem, i.e. balancing workloads of machines. Also defined are pertinent measures of balance for an objective function of the problem. Computational tests show that balancing workloads helps to reduce tardiness and makespan while enhance system throughput in a system with the characteristics of open job shops.
引用
收藏
页码:381 / 392
页数:12
相关论文
共 31 条
[1]  
Ammons J.C., Lofgren C.B., McGinnis L.F., A large scale machine loading problem in flexible assembly, Annals of Operations Research, 3, pp. 319-322, (1985)
[2]  
Berrada M., Stecke K.E., A branch and bound approach for machine load balancing in flexible manufacturing systems, Management Science, 32, 10, pp. 1316-1335, (1986)
[3]  
Blackstone J.H., Phillips D.T., Hogg G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations, International Journal of Production Research, 20, 1, pp. 27-45, (1982)
[4]  
Carlier J., Pinson E., An algorithm for solving the job-shop problem, Management Science, 35, 2, pp. 164-176, (1989)
[5]  
Chakravarty A.K., Shtub A., Selecting Parts and Loading Flexible Manufacturing Systems, pp. 284-289, (1984)
[6]  
Chao L.L., Statistics: Methods and Analysis, (1969)
[7]  
Daller Y Y., Stecke K.E., On the optimal allocation of servers and workloads in closed queueing networks, Operations Research, 38, 4, pp. 694-703, (1990)
[8]  
Greene T.J., Sadowski R.P., A mixed integer program for loading and scheduling multiple flexible manufacturing cells, European Journal of Operational Research, 24, 3, pp. 379-386, (1986)
[9]  
Han M.-H., Na Y.K., Hogg G.L., Real-time tool control and job dispatching in flexible manufacturing systems, International Journal of Production Research, 27, 8, pp. 1257-1267, (1989)
[10]  
Kim Y.-D., A comparison of dispatching rules for job shops with multiple identical jobs and alternative routeings, International Journal of Production Research, 28, 5, pp. 953-962, (1990)