PLANNING HORIZON PROCEDURES FOR MACHINE REPLACEMENT MODELS WITH SEVERAL POSSIBLE REPLACEMENT ALTERNATIVES

被引:52
作者
CHAND, S [1 ]
SETHI, S [1 ]
机构
[1] UNIV TORONTO,FAC MANAGEMENT STUDIES,TORONTO M5S 1A1,ONTARIO,CANADA
关键词
Compendex;
D O I
10.1002/nav.3800290310
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
INDUSTRIAL ECONOMICS - MACHINERY - Performance - MATHEMATICAL TECHNIQUES - Numerical Methods
引用
收藏
页码:483 / 493
页数:11
相关论文
共 8 条
[1]  
GORDON MJ, 1977, FINANCIAL DECISION M
[2]   PLANNING HORIZONS FOR DYNAMIC LOT SIZE MODEL - ZABEL VS PROTECTIVE PROCEDURES AND COMPUTATIONAL RESULTS [J].
LUNDIN, RA ;
MORTON, TE .
OPERATIONS RESEARCH, 1975, 23 (04) :711-734
[3]   SURVEY OF MAINTENANCE MODELS - CONTROL AND SURVEILLANCE OF DETERIORATING SYSTEMS [J].
PIERSKALLA, WP ;
VOELKER, JA .
NAVAL RESEARCH LOGISTICS, 1976, 23 (03) :353-388
[4]  
RAPP B, 1974, MODELS OPTIMAL INVES
[5]  
SETHI S, 1979, MANAGEMENT SCI, V25, P2
[6]   MIXED OPTIMIZATION TECHNIQUE FOR GENERALIZED MACHINE REPLACEMENT PROBLEM [J].
SETHI, SP ;
MORTON, TE .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1972, 19 (03) :471-&
[7]  
Terborgh G., 1949, DYNAMIC EQUIPMENT PO
[8]  
THOMPSON GL, 1978, MANAGEMENT SCI, V14, P9