共 16 条
[1]
Adam N.R., Oppenheim R., Surkis J., Time series analysis in determining endogenous due dates in job-shop simulation studies, Proceedings of the 10Th Annual Meeting of the American Institute for Decision Science, pp. 79-81, (1978)
[2]
Baker K.R., Sequencing and due date assignments in a job shop, Management Science, 30, pp. 1093-1104, (1984)
[3]
Baker K.R., Kanet J., Improved decision rule in a combined system for minimizing job tardiness, International Journal of Production Research, 22, pp. 917-921, (1984)
[4]
Bertrand J., The use of workload information to control job lateness in controlled and uncontrolled release production systems, Journal of Operations Management, 3, pp. 79-92, (1983)
[5]
Cheng T., Analysis of flow-time in a job shop, Journal of the Operational Research Society, 36, pp. 225-230, (1985)
[6]
Cheng T., Optimal due-date assignment in a job shop, International Journal of Production Research, 24, pp. 503-515, (1986)
[7]
Conway R.W., Maxwell W.L., Miller L.W., Theory of Scheduling, (1967)
[8]
Eilon S., Chowdhury I.G., Due dates in job shop scheduling, International Journal of Production Research, 14, pp. 223-237, (1976)
[9]
Enns S.T., A Dynamic Approach to the Job Shop Due-Date Setting Problem, (1991)
[10]
Law A.M., Kelton W.D., Simulation Modeling and Analysis, (1982)