LOT-SIZING AND SEQUENCING DELAYS

被引:24
作者
KARMARKAR, US
机构
[1] Univ of Rochester, Rochester, NY,, USA, Univ of Rochester, Rochester, NY, USA
关键词
D O I
10.1287/mnsc.33.3.419
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
12
引用
收藏
页码:419 / 423
页数:5
相关论文
共 12 条
[1]  
Baker K., 1974, INTRO SEQUENCING SCH
[2]  
Coffman E., 1976, COMPUTER JOB SCHEDUL
[3]  
Conway R, 1967, THEORY SCHEDULING
[4]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[5]  
DOBSON G, 1984, QM8419 U ROCH GRAD S
[6]  
DOBSON G, 1984, IN PRESS GENERAL JOB
[7]  
DOBSON G, 1984, QM8416 U ROCH GRAD S
[8]  
Graham R. L., 1979, Discrete Optimisation, P287
[9]   LOT-SIZING IN MULTI-ITEM MULTI-MACHINE JOB SHOPS [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S .
IIE TRANSACTIONS, 1985, 17 (03) :290-298
[10]   LOT-SIZING AND LEAD-TIME PERFORMANCE IN A MANUFACTURING CELL [J].
KARMARKAR, US ;
KEKRE, S ;
KEKRE, S ;
FREEMAN, S .
INTERFACES, 1985, 15 (02) :1-9