SCHEDULING AND CONTROL OF LINEAR PROJECTS

被引:16
作者
ELDIN, NN
SENOUCI, AB
机构
[1] Oregon State Univ, Corvallis, OR
关键词
DYNAMIC PROGRAMMING; LINEAR PROJECTS; SCHEDULING SYSTEMS; OPTIMIZATION OF COST AND SCHEDULING DURATIONS;
D O I
10.1139/l94-025
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A two-state-variable, N-stage dynamic programming approach to scheduling and control of linear projects is presented. This approach accounts for practical considerations related to work continuity, interruptions. and lags between successive activities. In the dynamic programming formulation, stages represent project activities and state variables represent possible activity resources and interruptions at each location. The objective of the dynamic programming solution is to provide for the selection of resources, interruptions, and lags for production activities tht lead to the minimum project total cost. In addition, the presented system produces a graphical presentation of the optimum project schedule and updates the original schedule based on update information input by the user. The updated schedule determines the new completion date, and forecasts the project new total cost based on the current project performance. A small linear project is provided as a numerical illustration of the system.
引用
收藏
页码:219 / 230
页数:12
相关论文
共 8 条
[1]  
ARDITI D, 1986, ASCE J CONSTRUCTION, V112, P411
[2]  
CARR RI, 1974, ASCE J CONSTRUCTION, V100, P403
[3]  
CHRZANOWSKI EN, 1986, ASCE J CONSTRUCTION, V112, P476
[4]  
JOHNSTON DW, 1981, ASCE J CONSTRUCTION, V107, P247
[5]  
O'Brien J.J., 1975, ASCE J CONSTRUCTION, V101, P895
[6]   RPM - REPETITIVE PROJECT MODELING [J].
REDA, RM .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1990, 116 (02) :316-330
[7]  
RUSSELL AD, 1988, ASCE J CONSTRUCTION, V114, P36
[8]  
SELINGER S, 1980, ASCE J CONSTRUCTION, V106, P195