THE 4 GAP DOUBLE DRIFT BUNCHER AT MUNICH

被引:12
作者
ROHRER, L
JAKOB, H
RUDOLPH, K
SKORKA, SJ
机构
[1] UNIV MUNCHEN,SEKT PHYS,D-8046 GARCHING,FED REP GER
[2] TECH UNIV MUNICH,D-8046 GARCHING,FED REP GER
关键词
D O I
10.1016/0167-5087(84)90429-0
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
引用
收藏
页码:161 / 164
页数:4
相关论文
共 8 条
[1]  
GARTNER N, 1981, JAHRESBERICHT BESCHL, P99
[2]   DOUBLE-DRIFT BEAM BUNCHING SYSTEMS [J].
MILNER, WT .
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, 1979, 26 (01) :1445-1449
[3]   MUNICH HEAVY-ION POST-ACCELERATOR [J].
NOLTE, E ;
GESCHONKE, G ;
BERDERMANN, K ;
OBERSCHMID, R ;
ZIERL, R ;
FEIL, M ;
JAHNKE, A ;
KRESS, M ;
MORINAGA, H .
NUCLEAR INSTRUMENTS & METHODS, 1979, 158 (2-3) :311-324
[4]  
RUDOLPH K, UNPUB NUCL INSTR MET
[5]  
RUDOLPH K, 1981, JAHRESBERICHT BESCHL, P103
[6]  
SKORKA SJ, 1981, 3 INT C EL ACC TECH, P130
[7]   THE PICOSECOND BUNCHING SYSTEM AT THE MUNICH MP TANDEM ACCELERATOR [J].
WAGNER, W ;
ZIERL, R ;
KIENLE, P ;
KORNER, HJ ;
REHM, KE ;
SPERR, P ;
ROHRER, L .
NUCLEAR INSTRUMENTS & METHODS, 1981, 184 (01) :195-196
[8]  
WAGNER W, 1980, 5 TAND C