SCHEDULING SUGAR-CANE PLANT AND RATOON CROPS AND A FALLOW - CONSTRAINED MARKOV MODEL

被引:8
作者
WHAN, BM [1 ]
SCOTT, CH [1 ]
JEFFERSON, TR [1 ]
机构
[1] UNIV NEW S WALES, KENSINGTON, AUSTRALIA
来源
JOURNAL OF AGRICULTURAL ENGINEERING RESEARCH | 1976年 / 21卷 / 03期
关键词
D O I
10.1016/0021-8634(76)90084-6
中图分类号
S2 [农业工程];
学科分类号
0828 ;
摘要
引用
收藏
页码:281 / 289
页数:9
相关论文
共 8 条
[1]  
ASTETONSMANN J, 1973, THESIS CORNELL U
[2]  
BOYCE D. S., 1968, Sugar y Azucar, V63, P32
[3]   PRODUCTION SCHEDULING AND ALLOCATION - NORMATIVE DECISION MODEL FOR SUGAR MILLING [J].
GUISE, JWB ;
RYLAND, GJ .
AUSTRALIAN JOURNAL OF AGRICULTURAL ECONOMICS, 1969, 13 (01) :8-24
[4]  
Howard R., 1960, DYNAMIC PROGRAMMING
[5]  
OSAKI S, 1970, MARKOVIAN DECISION P
[6]  
PINTO C. G., 1968, Revista de la Facultad de Agronomia, V5, P27
[7]  
ROSTRON H, 1972, Proceedings of the South African Sugar Technologists Association Annual Congress, V46, P142
[8]   LINEAR-PROGRAMMING IN A MARKOV-CHAIN [J].
WOLFE, P ;
DANTZIG, GB .
OPERATIONS RESEARCH, 1962, 10 (05) :702-710