OPTIMAL INTER-PROCESS STEEL PRODUCTION SCHEDULING

被引:16
作者
JACOBS, TL [1 ]
WRIGHT, JR [1 ]
COBBS, AE [1 ]
机构
[1] BETHLEHEM STEEL CORP,CHESTERTON,IN 46304
关键词
D O I
10.1016/0305-0548(88)90046-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
引用
收藏
页码:497 / 507
页数:11
相关论文
共 13 条
[1]   A COMPUTER-BASED STRATEGIC-PLANNING SYSTEM FOR STEEL PRODUCTION [J].
BIELEFELD, FW ;
WALTER, KD ;
WARTMANN, R .
INTERFACES, 1986, 16 (04) :41-46
[2]  
BULLINGTON SF, 135 PURD LAB APPL IN
[3]   A LINEAR-PROGRAMMING MODEL OF INTEGRATED IRON AND STEEL PRODUCTION [J].
FABIAN, T .
MANAGEMENT SCIENCE, 1958, 4 (04) :415-449
[4]  
JAMILI RE, 1984, 142 PURD LAB APPL IN
[5]  
Lee S.M., 1972, GOAL PROGRAMMING DEC, V1st
[6]  
MACKULAK GT, 1977, 92 PURD LAB APPL IND
[7]  
MAGGIO RA, 1983, MODELING SIMUL, V14, P1099
[8]  
PAPAPANAGIOTOU I, 1984, 141 PURD LAB APPL IN
[9]   A Mixed Integer Programming Model for Scheduling Orders in a Steel Mill [J].
Redwine, C. N. ;
Wismer, D. A. .
JOURNAL OF OPTIMIZATION THEORY AND APPLICATIONS, 1974, 14 (03) :305-318
[10]   A MATHEMATICAL-PROGRAMMING APPROACH TO SCHEDULE MASTER SLAB CASTERS IN THE STEEL-INDUSTRY [J].
VONDEREMBSE, MA ;
HAESSLER, RW .
MANAGEMENT SCIENCE, 1982, 28 (12) :1450-1461