AN EVALUATION OF SCHEDULING POLICIES IN A DUAL RESOURCE CONSTRAINED ASSEMBLY SHOP

被引:19
作者
RUSSELL, RS
TAYLOR, BW
机构
关键词
D O I
10.1080/07408178508975297
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:219 / 232
页数:14
相关论文
共 39 条
[1]  
Baker K. R., 1981, J OPER MANAGE, V1, P109
[2]  
Berry W.L., 1972, AIIE T, V4, P267
[3]   A STATE-OF-THE-ART SURVEY OF DISPATCHING RULES FOR MANUFACTURING JOB SHOP OPERATIONS [J].
BLACKSTONE, JH ;
PHILLIPS, DT ;
HOGG, GL .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) :27-45
[4]  
BUFFA ES, 1979, PRODUCTION INVENTORY, P492
[5]  
BULKIN MH, 1966, MANAGE SCI, V13, P29
[6]  
Conway R, 1967, THEORY SCHEDULING
[7]  
CONWAY RW, 1964, RM3789PR RAND CORP M
[8]  
DAREL EM, 1982, J MANUFACTURING SYST, V1, P1
[9]   REVIEW OF SEQUENCING RESEARCH [J].
DAY, JE ;
HOTTENSTEIN, MP .
NAVAL RESEARCH LOGISTICS QUARTERLY, 1970, 17 (01) :11-+
[10]  
Eilon S., 1976, International Journal of Production Research, V14, P223, DOI 10.1080/00207547608956596