共 15 条
[1]
Bard J., A heuristic for minimizing the number of tool switches on a flexible manufacturing line, IIE Transactions, 20, pp. 382-391, (1988)
[2]
Jaikumar R., Van Wassenhove L.N., Production planning in flexible manufacturing systems, Journal of Manufacturing and Operations Management, 2, pp. 52-78, (1989)
[3]
Marsten R., XMP Users Manual, XMP Software, (1985)
[4]
O'Grady P., Menon U., A concise review offlexiblemanufacturingsystemsand FMS literature, Computers in Industry, 7, pp. 155-167, (1986)
[5]
Palekar U.S., Karwan M., H,, and Zionts, S, Branch and Bound Method for the Fixed Charge Transportation Problem, Management Science, 36, pp. 1092-1105, (1990)
[6]
Sarin S., Chen C.S., The machine loading and tool allocation problem in a flexible manufacturing system, International Journal of Production Research, 25, pp. 1081-1094, (1987)
[7]
Schrage L., UNDO Users Manual, (1981)
[8]
Shanker K., Srinivasalu A., Some solution methodologies for loading problems in a flexible manufacturing system, International Journal of Production Research, 21, pp. 1019-1034, (1989)
[9]
Sodhi M.S., Hierarchical models for FMS control, Dissertation, (1991)
[10]
Sodhi M.S., Agnetis A., Askin R.G., Tool Addition Strategies for Flexible Manufacturing Systems, (1992)