SINGLE FACILITY SCHEDULING WITH NONLINEAR PROCESSING TIMES

被引:311
作者
GUPTA, JND [1 ]
GUPTA, SK [1 ]
机构
[1] FLORIDA INT UNIV,DEPT DECIS SCI,MIAMI,FL 33199
关键词
Nonlinear Processing Times - Static Single Facility Problem;
D O I
10.1016/0360-8352(88)90041-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper considers the static single facility scheduling problem where the processing times of jobs are a monotonically increasing function of their starting (waiting) times and the objective is to minimize the total elapsed time (called the makespan) in which all jobs complete their processing. Based on the combinatorial analysis of the problem, an exact optimization algorithm is developed for the general processing time function which is then specialized for the linear case. In view of the excessive computational burden of the exact optimization algorithm for the nonlinear processing time functions, heuristic algorithms are proposed. The effectiveness of these proposed algorithms is empirically evaluated and found to indicate that these heuristic algorithms yield optimal or near optimal schedules in many cases.
引用
收藏
页码:387 / 393
页数:7
相关论文
共 5 条
[1]  
Garey MR., 1979, COMPUTERS INTRACTABI
[2]  
Gupta JND, 1979, DISAGGREGATION PROBL
[3]  
GUPTA JND, 1971, OPNS RES, V20, P1753
[4]  
GUPTA JND, 1972, AIIE T, V4, P238
[5]   SCHEDULING TASKS WITH DEADLINES AND NON-LINEAR LOSS FUNCTIONS [J].
SCHILD, A ;
FREDMAN, IJ .
MANAGEMENT SCIENCE, 1962, 9 (01) :73-81