A SYSTEM-THEORETIC PROPERTY OF SERIAL PRODUCTION LINES - IMPROVABILITY

被引:71
作者
JACOBS, D [1 ]
MEERKOV, SM [1 ]
机构
[1] UNIV MICHIGAN,DEPT ELECT ENGN & COMP SCI,DIV SYST SCI,ANN ARBOR,MI 48109
基金
美国国家科学基金会;
关键词
D O I
10.1080/00207729508929067
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A production system is described as improvable if the limited resources involved in its operation can be redistributed so that a performance measure is improved. In this paper the property of improvability is analysed for the case of a particular system, the serial production line. Improvability of the production rate with respect to machine efficiency and work-in-process distribution is analysed, appropriate indicators of improvability are derived, and their utilization in the process of continuous improvement is discussed. It is shown, in particular, that in a well-designed system each buffer is on average half-full, and each intermediate machine has equal frequencies of blockages and starvations.
引用
收藏
页码:755 / 785
页数:31
相关论文
共 26 条
[1]  
BARTEN K, 1969, J IND ENG, V13, P245
[2]   INTERSTAGE BUFFER STORAGE CAPACITY OF NON-POWERED ASSEMBLY LINES - SIMPLE MATHEMATICAL APPROACH [J].
BASU, RN .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1977, 15 (04) :365-382
[3]  
Bellman R., 1960, INTRO MATRIX ANAL, DOI [10.1137/1.9781611971170.fm, DOI 10.1137/1.9781611971170.FM]
[4]  
Buxey GM, 1973, AIIE T, V5, P37
[5]  
BUZACOTT JA, 1967, INT J PROD RES, V5, P183, DOI DOI 10.1080/00207546708929751
[6]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241
[7]   AN EFFICIENT ALGORITHM FOR ANALYSIS OF TRANSFER LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS [J].
DALLERY, Y ;
DAVID, R ;
XIE, XL .
IIE TRANSACTIONS, 1988, 20 (03) :280-283
[8]   APPROXIMATE ANALYSIS OF TRANSFER LINES WITH UNRELIABLE MACHINES AND FINITE BUFFERS [J].
DALLERY, Y ;
DAVID, R ;
XIE, XL .
IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1989, 34 (09) :943-953
[9]  
Deming EW, 1986, OUT CRISIS
[10]  
Freeman M. C., 1964, J IND ENGINEERING, V15, P194