A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

被引:214
作者
OZDAMAR, L [1 ]
ULUSOY, G [1 ]
机构
[1] BOGAZICI UNIV,DEPT IND ENGN,ISTANBUL 80815,TURKEY
关键词
D O I
10.1080/07408179508936773
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, research on the resource-constrained project scheduling problem is classified according to specified objectives and constraints. Each classified area is extensively surveyed, and special emphasis is given to trends in recent research. Specific papers involving nonrenewable resource constraints and time/cost-based objectives are discussed in detail because they present models that are close representations of real-world problems. The difficulty of solving such complex models by optimization techniques is noted. For the purposes of this survey, a set of 78 optimally solved test problems from the literature and a second set of 110 benchmark problems have been subjected to analysis with some well-known dispatching rules and a scheduling algorithm that consists of a decision-making process utilizing the problem constraints as a base of selection. The computational results are reported and discussed in the text. Constructive scheduling algorithms that are directly based on the problem constraints and whose performances are independent of problem characteristics are identified as a promising area for future research.
引用
收藏
页码:574 / 586
页数:13
相关论文
共 85 条
[1]  
ALVAREZVALDES R, 1989, ADV PROJECT SCHEDULI, P113
[2]  
BAROUM S, 1989, HEURISTIC ALGORITHM
[3]  
BELL CE, 1991, NAV RES LOG, V38, P315, DOI 10.1002/1520-6750(199106)38:3<315::AID-NAV3220380304>3.0.CO
[4]  
2-7
[5]  
BELL CE, 1990, NAV RES LOG, V37, P61, DOI 10.1002/1520-6750(199002)37:1<61::AID-NAV3220370104>3.0.CO
[6]  
2-S
[7]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[8]   NEW TRENDS IN MACHINE SCHEDULING [J].
BLAZEWICZ, J ;
FINKE, G ;
HAUPT, R ;
SCHMIDT, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 37 (03) :303-317
[9]   A COMPARISON OF DUE DATE SETTING, RESOURCE ASSIGNMENT, AND JOB PREEMPTION HEURISTICS FOR THE MULTIPROJECT SCHEDULING PROBLEM [J].
BOCK, DB ;
PATTERSON, JH .
DECISION SCIENCES, 1990, 21 (02) :387-402
[10]   SOME EFFICIENT MULTI-HEURISTIC PROCEDURES FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING [J].
BOCTOR, FF .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 49 (01) :3-13